Maintenance priorities · Free browser tool
Bad Actor Pareto Chart Builder
Find which recorded equipment events dominate cost or downtime. Load a CMMS export locally, review the data, and choose a useful investigation priority.
Load, map and rank locally.
Free · no sign-in · no upload · no email required. Inputs and results stay in this page. Links and exports are shared only when you choose.
Your results
Rank the recorded burden. Then investigate the cause.
A Pareto chart sorts categories from largest to smallest for one metric and plots their cumulative share. It does not prove a failure mechanism, consequence, criticality or an 80/20 split. The cutoff includes the group that first reaches or exceeds the chosen cumulative share.
Each included CSV row counts as one event. Confirm that work order line items and duplicate records do not inflate the count. Grouping ignores case and trims spaces; the first-seen label is retained. Ties sort by cost, event count and then key. Other combines all groups beyond the chart’s display limit; percentages still use all included groups.
Missing or unparseable numeric cells are treated as zero and reported. US-style decimals and dollar/thousands formatting are supported. Negative credits remain in the net totals. If a group’s selected metric is negative or the total is nonpositive, the ranked table remains available and the conventional cumulative chart is withheld. Do not mistake a credit adjustment for negative physical downtime.
Choose the source date format explicitly. Invalid or missing dates are counted; a date filter excludes those rows. Approximate mean time between dated events is (last date − first date) ÷ (number of dated events − 1). It omits boundary exposure and operating hours and is not predictive MTBF.
This is a ranked-bar and cumulative-percentage chart. A reliability Jackknife diagram instead compares event frequency with mean downtime on a log-scatter plot. See Pareto versus Jackknife for when each is useful.
Worked example: a synthetic maintenance export.
Example (synthetic): The included 20-row sample totals $43,800 and 61 downtime hours. Grouped by asset and ranked by cost, the top four of seven groups account for 84.36% of recorded cost. That is a prioritization observation, not an RCA result or a promised saving.
Questions before you use the result
Does my file leave this browser?
No file or parsed row is uploaded. Processing uses a local worker, and this route and worker are served with connect-src none. There are no tool analytics or account-save calls. After the local processor is ready, loading, ranking and exporting work offline.
What can I import?
UTF-8, UTF-8 BOM or Windows-1252 CSV/TSV/text, up to 25 MB, 50,000 data rows, 100 columns and 10,000 characters per field. Comma, semicolon and tab delimiters and quoted newlines are supported. Filter or split larger exports.
What does a copied link contain?
Only the grouping, metric, cutoff and chart group count. It excludes imported rows, column names, labels, dates and work order type filters. Recipients load their own data.
Will the page remember my data?
No. This version keeps it only in memory. Clear all local data or reload to remove it. Downloaded files and browser print output remain under your control.
Why is the table limited on screen?
The page shows up to 200 ranked groups to keep large imports responsive. The CSV export includes every group.
Method and sources
Method references checked November 21, 2026. Original Apex explanations, diagrams, examples and implementation; no copyrighted standard tables or figures are reproduced.
- ASQ: What is a Pareto chart? — Ranked categories, totals, cumulative shares and Other grouping. No publisher chart is copied.
- Apex: Pareto and reliability Jackknife — Different views answer different prioritization questions.
This tool provides an engineering estimate, not a substitute for OEM data or a qualified engineer. Results depend on the inputs you provide and on published approximations that may not fit your equipment. Verify before acting.
Turn the result into a practical next step.
Apex can help review the evidence, scope and maintenance decision. Calculator inputs and imported rows are not transferred to the inquiry.