Services

A Focused One-day Reliability Assessment

Start with a specific production line, asset group, or recurring failure problem. Preparation, an on-site review, and a concise written action plan, for $2,400 plus agreed travel costs.

$2,400 + agreed travel · preparation, one on-site day and a concise written action plan.

See Program assessment sample · fictional sample deliverable.

Outputs for the agreed scope

  • Preparation on the agreed target before the visit
  • An on-site review of that production line, asset group, or recurring failure problem
  • A concise written action plan

Final scope and availability require review.

Start with a focused, one-day assessment of a specific production line, asset group, or recurring failure problem. For $2,400 plus agreed travel costs, you receive preparation, an on-site review, and a concise written action plan. Broader assessments and implementation are scoped separately.

What the day is for

Preparation happens before the visit, using data you supply about the agreed target. The on-site day is spent on a walkdown of that line, asset group, or problem, a review of relevant failure and PM history, and structured conversations with the people who run and maintain it. Findings are written as a concise action plan, with assumptions stated, not as a false-precision single number. Illustrative excerpts of written formats are on the sample deliverables page; those figures are generic example data, not client results, and a plant-wide top-10 list is the output of a broader assessment, not of this focused offer.

What you leave with

  • Preparation on the agreed target before the visit
  • An on-site review of that production line, asset group, or recurring failure problem
  • A concise written action plan
  • Notes on where a broader assessment, or a deeper RCM, FMEA, RCA, or PdM design, would be a logical next step

Remote review or an on-site assessment?

Remote Reliability Review

$1,200 fixed

Best when…
You have records for one asset, line or recurring failure mode, and the next step can be identified without measurements or a walkdown.
Includes
Review of up to 12 months of supplied records, one 60-minute call, and a written action plan with prioritized next steps and missing evidence.
Explore the remote review →

Focused on-site Reliability Assessment

$2,400 + agreed travel

Best when…
The problem needs a walkdown, direct observation or conversations with the people who run and maintain the equipment.
Includes
Preparation, one on-site day on an agreed target, and a concise written action plan. Advanced testing is scoped separately.
Ask about the on-site assessment →

A consulting day and an assessment are different scopes

The $1,200 on-site consulting day is a day rate; the total engagement requires an agreed scope and travel is at cost. The $2,400 focused assessment is a fixed package covering preparation, one on-site day on an agreed target, and a concise written action plan, plus agreed travel. It is not a requirement before requesting RCA, PdM or bench work; those engagements are scoped separately.

The $1,200 remote review fee is credited toward the $2,400 focused assessment booked within 60 calendar days after delivery of the written remote action plan. Agreed travel is separate.

Broader assessments, scoped separately

A plant-wide Reliability Assessment — a fixed 2–3 day on-site engagement with a prioritized top-10 risk list and a leadership-ready summary — remains available from $6,000, plus travel at cost, agreed in writing. That broader scope is not included in the $2,400 focused fee, and the focused offer does not automatically expand to it.

Not sure whether an assessment is the right next step? Start with the ungated downtime priorities self-check. If you already know the system and need a finance-ready memo, see the $3,000 remote funding-case package. If you want to test the math first, use the free calculator.

Ask about a focused one-day assessment

Send a request through the inquiry form or contact Apex by email. A focused one-day assessment is $2,400 plus agreed travel costs and includes preparation, an on-site review, and a concise written action plan for an agreed target. Broader assessments are scoped separately. You can also ask for a 20–30-minute fit conversation — not a free analysis.

Ask About a One-day AssessmentOr email inquiry@apexreng.com.

ScopeOne day on-site, focused
TargetA specific line, asset group, or problem
OutputConcise written action plan
Price$2,400 plus agreed travel costs
How it works

Scoped per job. No retainers, no mystery.

  1. A 20–30-minute fit conversationYou describe the asset, the pain, and what “fixed” looks like. You get an honest answer on whether the work is a fit and what it takes. This is a fit conversation, not a free analysis.
  2. A scoped proposalDeliverables, timeline, and price in writing before anything starts. You approve the scope, not a blank check.
  3. The work, with your teamSessions and analysis done alongside your people, so the method stays in the building when the engagement ends.
  4. Deliverables you can act onAn action plan, a business case, or an investigation report — in your format, ready to use.
Purchasing

Work can be purchased by purchase order or invoice. Supplier documents are reviewed before release. Use the PO / invoice form, or email inquiry@apexreng.com.

Client confidentiality

Client information is handled under the agreed confidentiality terms and our privacy policy.

FAQ

Questions that usually come up

What is the fee?

The focused one-day assessment is $2,400 plus agreed travel costs. That includes preparation, an on-site review, and a concise written action plan for a specific production line, asset group, or recurring failure problem. Broader assessments and implementation are scoped separately. A plant-wide assessment, when you need one, is a fixed 2–3 day on-site engagement, from $6,000 plus travel at cost, agreed in writing. That broader scope is not included in the $2,400 fee.

What do you need before the visit?

A clear statement of the agreed target — a production line, asset group, or recurring failure problem — plus recent downtime or work-order history if you have it, and access to the people who know that area. We will tell you what is missing rather than invent a picture from a thin file.

Is this a plant-wide assessment or a full RCM analysis?

No. The $2,400 offer is a focused look at an agreed target, not a plant-wide top-10 ranking and not a full RCM or FMEA. Those broader assessments and analyses can follow, as separately scoped engagements.

Ready when you are

Start with a short self-check, or email about an assessment.

Look inside the work

Relevant reports and sample deliverables

These reports show methods and formats, not a promise of scope or results for your engagement.

Browse the full report library →

Ask About a One-day Assessment