Downtime Cost Calculator

A cost-of-downtime per hour is the conversion factor that turns hours of a failure into dollars. If that factor is wrong, every business case that uses it will be wrong in the same direction. This page is a practical formula, a checklist, and one synthetic example. It is not a universal constant, and it is not financial advice.

Free, in your browser. Illustrative inputs are editable; an estimate is not a forecast.

Free tool · About 2 minutes

What does unplanned downtime really cost your plant?

Most plants report downtime in hours. Finance approves money in dollars. Choose your scope and data period, then estimate the cost of downtime. Review the assumptions with your finance partner before using the result.

Illustrative example inputs — replace them with your own data. Figures stay in your browser unless you choose to save a scenario or email a report. Downloads are free and require no account.

1. Scope and data period

months
Use 3 for three months of records, for example. Enter all downtime and loss costs for this same period. The annual estimate multiplies them by 12 ÷ months.
Enter 0.1 to 120 months.

2. Downtime and output value

hours
Total breakdown hours in your observation period, for the scope above. Leave out planned stops and changeovers.
Enter zero or more hours.
units/h
Good output actually prevented per downtime hour for this scope, at normal speed. Account for buffers or parallel capacity that keep plant output running; nameplate capacity alone can overstate the loss.
Enter zero or more units per hour.
$
Selling price minus variable costs per units (materials, packaging, freight and direct energy). Finance calls this contribution margin. It is neither sales revenue nor net profit; confirm the figure with finance.
Enter zero or more dollars.

3. Output recovery

%
Share of missed output actually made up later, at the same production rate. If 70% is recovered, the other 30% is never produced — it is not automatically scrap. Use 0% when recovery is not possible.
Enter a value from 0 to 100.
$/h
Extra cost to run an hour on overtime: crew overtime premium, utilities, supervision.
Enter zero or more dollars.

4. Other costs of breakdowns (optional)

$/period
The extra over a planned repair: overtime, expedited parts and freight, contractor call-outs.
Enter zero or more dollars.
$/period
Physical product/material actually lost or scrapped in this period. Use its net loss cost, excluding any amount already in output value, repair or other losses. Unproduced volume is not scrap.
Enter zero or more dollars.
$/period
Incremental cleaning, disposal or other breakdown costs in this period. Exclude anything already entered in product loss, recovery or repair.
Enter zero or more dollars.

Annualized downtime cost estimate

—per year

Production and recovery cost about — per downtime hour, blended across lost and recovered output. Other entered costs are added below.

  • Value of output never produced——
  • Extra recovery cost——
  • Emergency repair premium——
  • Product loss——
  • Other losses——

What a reduction would be worth

25%
Per year
—
at full effect
Over 5 years, today's dollars
—
present value of gross benefits under these assumptions; excludes program costs
%
Get Engineering Help With a Funding Request

Take your estimate with you

Includes scope, observation period, inputs, annualization, breakdown, equations and limitations. USD. No sign-in required.

Email me a report (optional)

Your address and calculation are sent through Google Workspace for delivery. Apex stores delivery status, not a separate report or lead. The message remains in the sender and recipient mailboxes under their email retention settings. Avoid confidential plant data. Privacy information.

How this is calculated
Output never produced is valued at selling price minus variable costs. Output made up later adds only the extra recovery cost. Repair premium, physical product loss and other losses are separate. Observed cost is multiplied by 12 ÷ months for the annual estimate. This is the method used in Apex reports, and a basis to discuss with your controller.
What this estimate does not include
Minor stops under the downtime log's threshold, speed and quality losses, missed orders or customer penalties, and safety or food-safety exposure. The reduction value assumes full effect from year one; real programs ramp up over one to two years, so treat it as an upper bound. A full baseline reconciles these figures to your ledger and downtime log.

Checklist

  • Units per hour at the constrained resource, not at a theoretical nameplate if the plant never runs there
  • Contribution margin per unit (selling price minus variable cost), agreed with finance if you can
  • Unrecoverable share of lost output, with a sentence of justification
  • Crew that is idle, or redeployed at a real cost, during the stop
  • Overtime or contractor hours to recover, and the premium, not the full wage if the wage would have been paid anyway
  • Scrap, spoilage, or yield loss caused by the stop
  • Fixed event costs: expedited parts, travel, cleanup, disposal, regulatory notification if it applies
  • What you are deliberately leaving out (for example, allocated overhead, or reputational loss you cannot quantify)

A synthetic example

Synthetic example — illustrative data, not from any client or employer

A line runs 100 units per hour. Contribution margin is $20 per unit. The lost output cannot be recovered (100 percent). Two operators are idle at $40 per hour each. Overtime is not used. Fixed event costs (a premium freight part and a contractor) are $3,000. The event lasts six hours.

$/h = (20 × 100 × 1.0) + (2 × 40) = $2,080

To reproduce the event cost in this tool, choose a one-month observation period, 6 downtime hours, 100 units per hour, $20 unit value after variable costs, 0% recovered output, $480 emergency repair premium and $3,000 other losses. Set product loss to $0. The observed event cost is $15,480. Annualization would multiply that one-month total by 12; that is only useful if the month represents a normal year. Count repair labor in one category only.

Common mistakes

  • Revenue instead of margin. This is the usual overstatement.
  • Assuming nothing is recoverable in a plant that routinely catches up, or assuming everything is recoverable in a sold-out plant.
  • Double counting overtime and lost margin on the same recovered units.
  • Loading in allocated overhead that does not change when the line stops.
  • Precision theater — a figure to the nearest dollar when the margin itself is a range.

When you have a $/h you can defend, put it into the RCM ROI calculator or the method. A forwardable write-up is the business-case template, or the business case engagement.

FAQ

Questions that usually come up

Should I use revenue or margin?

Use contribution margin on output you cannot recover, not gross revenue. Revenue counts costs you did not incur, and it counts production you may make up later in the week.

What if we make up the lost units on overtime?

Then the unrecoverable percentage should be lower, and the overtime premium belongs in the cost. Do not count both a full lost-margin hour and the overtime that recovered it.

Can I just enter a $/hour figure I already have?

Yes. If finance has already accepted a downtime cost, use it and cite it. The calculator has an override field for that.