PM audit and PM optimization is for plants whose preventive maintenance program has grown by addition — and now takes more hours than it returns. The work is a structured review: which tasks still address a failure mode, which are low-value habit, and which failure modes have no task at all.
What the audit looks at
We sample or, if the list is short, review the PM program against asset criticality, failure history, and (where they exist) existing FMEAs. Tasks are sorted into keep, modify, combine, drop, or add. Intervals are treated as assumptions that should be justified by failure evidence, vendor guidance, or a stated P-F interval — not only by a calendar default. The PM Program Audit Toolkit and the free Ask about a PM checklist use the same logic if you want to start in-house.
What you leave with
- A marked-up view of the agreed PM set, with a recommendation on each task
- A list of missing failure-mode coverage worth adding
- Interval notes that say what the recommendation is based on
If you need a clean-sheet analysis rather than a review of today’s PMs, see RCM facilitation. Life-data questions can be supported with the Weibull toolkit, used only when the data set can actually support a fit.
Day rate$1,200 per on-site day
TravelBilled at cost
Remote workScoped and priced per engagement
Specialized testingUltrasound, thermography, or motor-circuit work is quoted separately