Does It Pay Back?
Example numbersPays back in
1 year 11 months
- Today's loss $250,000 a year (100 h × $2,500/h) → $175,000 after a 30% cut. Savings $75,000 a year once fully running, $65,000 after ongoing cost.
- Conservative case (15% cut, half the expected): pays back in 3 years 2 months, NPV $20,900.
- High case is available when custom reduction ranges are entered.
- It pays for itself over 5 years if it cuts the loss by at least 12.1%.
Cumulative cash by year, before discounting. Year 0 is the upfront cost.
Savings build up over 2 years (25%, 75%, then full) · 5 years at 10%
Enter today's loss to see a payback.
No cost entered yet, so it pays back right away. Add the upfront and ongoing cost to test the decision.
The ongoing cost is at least as large as the savings, so it never pays back.
A cut above 90% is rare. Check it against the failures the improvement actually prevents.
Fix the highlighted field to update the result.
More results
Year by Year (Expected Case)
| Year | Savings | Ongoing cost | Net | Cumulative | Discounted |
|---|---|---|---|---|---|
| 0 (upfront) | — | — | −$50,000 | −$50,000 | −$50,000 |
| 1 | $18,750 | −$10,000 | $8,750 | −$41,250 | $7,955 |
| 2 | $56,250 | −$10,000 | $46,250 | $5,000 | $38,223 |
| 3 | $75,000 | −$10,000 | $65,000 | $70,000 | $48,835 |
| 4 | $75,000 | −$10,000 | $65,000 | $135,000 | $44,396 |
| 5 | $75,000 | −$10,000 | $65,000 | $200,000 | $40,360 |
Cases
| Case | Cut | Savings a year | Payback | NPV | ROI |
|---|---|---|---|---|---|
| Conservative | 15% | $37,500 | 3 years 2 months | $20,900 | 24% |
| Expected | 30% | $75,000 | 1 year 11 months | $130,000 | 148% |
Risk-adjusted NPV: $64,500, with a 70% chance it works as planned. Costs are counted in full; savings at 70%.
You could spend up to $180,000 upfront and still break even over 5 years.
What Moves the Answer Most
| Driver | 20% lower | 20% higher |
|---|---|---|
| Yearly savings (today's loss or the cut) | $86,200 | $173,000 |
| Discount rate | $141,000 | $119,000 |
| Upfront cost | $140,000 | $120,000 |
| Ongoing cost per year | $137,000 | $122,000 |
Show the math
Today's loss = hours a year × cost per hour + other yearly costs
Savings in year t = loss × cut × build-up(t)
Net in year t = savings − ongoing cost
NPV = −upfront + Σ net ÷ (1 + rate)^t
ROI = NPV ÷ (upfront + Σ ongoing ÷ (1 + rate)^t)
Payback = when cumulative net cash reaches zero
Keep a Copy
Free account needed. Your inputs stay on this page and the action finishes once you're signed in.
Open an Older Saved Scenario
Comparison
The kept option stays fixed while you change the inputs. It lasts until you clear it or leave the page.
Next: Write the Case
Turn these numbers into a one-page business case for your plant manager or controller.
Open the Business Case TemplateNeed a better cost per hour first?
Work It Out in the Downtime Cost CalculatorToday's loss is downtime hours times your cost per hour, plus other failure costs (or, from failure history, failures a year times the cost of each). The improvement removes the share you expect. Savings build up over two years unless you change it. Payback counts the upfront cost back from those yearly savings after ongoing costs. NPV discounts each year's net savings at your rate. ROI is NPV divided by the discounted costs.
Tax, depreciation, financing and inflation; the value of reduced safety and environmental risk; savings outside the downtime you entered. Finance may adjust for these. Results are estimates from your inputs, not a guarantee of savings.
Worked Example & More Details
Worked Example
Illustrative numbers, not from any plant. A packaging line loses about 100 hours a year to gearbox failures, at $2,500 an hour (from the Downtime Cost Calculator): $250,000 a year. A condition-monitoring route plus a planned gearbox rebuild costs $50,000 up front and $10,000 a year. The team expects it to remove 30% of that loss once it is fully working: $75,000 a year.
Savings: $18,750 (year 1) · $56,250 (year 2) · $75,000 (year 3 on)
Net after $10,000 a year: $8,750 · $46,250 · $65,000
$50,000 back in 1 year 11 months · NPV (5 years, 10%) ≈ $130,000 · ROI ≈ 148%
It pays for itself if it removes at least 12.1% of the loss. If it only removes half of what the team expects (15%), payback stretches to 3 years 2 months.
Questions That Usually Come Up
Why is payback longer than upfront cost divided by yearly savings?
Because savings take time to build up. The calculator counts 25% of the full saving in year 1 and 75% in year 2. If yours will be at full effect from the start, choose "Full savings from year 1" under More options.
What cut should I assume?
Base it on the failures the improvement actually addresses, and on results from similar fixes at your plant. If you're unsure, look at the break-even line: it tells you how good the fix has to be.
Where does the cost per hour come from?
Use the Downtime Cost Calculator, or a figure your finance team already accepts. If it already includes repairs and scrap, don't add them again here.
What is risk-adjusted NPV?
NPV if there's a chance the improvement doesn't deliver. It counts the costs in full and only your chosen share of the savings.
Should I use failure history or hours a year?
Hours a year is quicker. Failure history shows which failure modes drive the loss and how much a bad year could cost, if you have counts from your work orders.
Pays back in 1 year 11 months. NPV $130,000 over 5 years, ROI 148%. These are example numbers.
Continue Your Funding Case
Your numbers return to the local funding draft only when you choose. Review assumptions before submitting a proposal.