Downtime Cost Calculator
What does an hour of unplanned downtime cost your plant? Results update as you type. Free, and no account is needed to see them.
Free tool · About 1 minute
Estimate Your Downtime Cost
Example numbers are filled in. Replace them with yours. Your figures stay in this browser unless you save or download.
Estimated Downtime Cost
Example numbers$250,000a year
$2,500 per downtime hour, all costs · 100 hours in the last 12 months
Fix the highlighted field to update the result.
- Margin lost on output never made$250,000100%
- Overtime to make up outputnot entered
- Emergency repair premiumnot entered
- Scrap and product lossnot entered
- Other breakdown costsnot entered
Of 100,000 units lost during these stops, 50,000 are made up later and 50,000 are never made. Never made is not scrap.
Biggest lever: output made up later. Every 10 points changes this by $50,000.
What Cutting It Would Be Worth
$62,500a year if downtime cost falls 25%
Show 5-year value
$237,000over 5 years in today's dollars
Present value of the yearly saving, before any project cost. An upper bound: real programs take one to two years to reach full effect.
Will a Fix Pay Back?
Take these numbers into the Payback & ROI Calculator and test a project against them.
Keep a Copy
Report Details & Company Logo (Optional)
Signed-in profile details fill suitable empty fields. Edit them for this report without changing your saved profile or calculation. These details are not added to shared links.
Add a private company logo in Edit Profile to reuse it here.
Edit Profile and Company Logo. New report edits stay on this page.
Free account needed. Your inputs stay on this page and the action finishes once you're signed in.
Not sure which equipment to cost first? Answer five questions
These prompts point you to a useful starting point. They don't estimate cost.
Output never made is valued at selling price minus variable costs. Output made up later adds only the overtime to make it up. Repair premium, scrap and other costs are added separately. For a period other than 12 months, totals are multiplied by 12 ÷ months.
Minor stops under your log's threshold, speed and quality losses, missed orders or customer penalties, and safety or environmental exposure. The reduction value assumes full effect from year one; treat it as an upper bound.
Worked Example & More Details
Worked Example
Illustrative numbers, not from any plant. A line makes 100 units an hour, with a margin of $20 a unit. None of the lost output can be made up. A premium-freight part and a contractor cost $3,000. The breakdown lasts six hours.
Cost per hour = 100 × $20 = $2,000
Breakdown = 6 × $2,000 + $3,000 = $15,000
The two operators' wages are not added. They are paid either way, and this margin does not subtract labour, so adding them would count a cost that did not change. If your margin per unit does subtract direct labour, add idle wages under Other breakdown costs.
Questions That Usually Come Up
Should I use revenue or margin?
Use contribution margin on output you cannot make up, not revenue. Revenue counts costs you did not incur, and production you may make up later in the week.
What if we make up the lost units on overtime?
Then raise the share made up later and enter the overtime cost under More cost detail. Don't count both a full lost-margin hour and the overtime that recovered it.
Can I just enter a $/hour figure I already have?
Yes. Choose "I already have a cost per hour" and enter it. If finance has already accepted a figure, note where it came from in your report.
What about idle crew wages?
Count them only if your margin per unit already subtracts direct labour. If it doesn't, the wages are already inside the lost margin, because they are paid whether the line runs or not.
Estimated cost $250,000 a year. $2,500 per downtime hour. These are example numbers.
Continue Your Funding Case
Your numbers return to the local funding draft only when you choose. Review assumptions before submitting a proposal.