Too Much Reactive Maintenance

When urgent work consumes the schedule, start by making the recurring burden visible. One bounded problem is easier to act on than a plant-wide wish list.

Make the Next Decision Concrete.

  1. Agree what counts as a breakdown, planned work and repeat work before comparing records.
  2. Rank equipment by recorded downtime or cost, then check missing records, duplicates and operating exposure.
  3. Choose one recurring failure mode. Record its consequence, existing controls and evidence gaps.
  4. Assign an owner and a review date. Check whether the action changed the failure mechanism or only restored operation.

Use available records and qualified site personnel. This is general guidance, not a diagnosis, safety assessment or authorization to operate.