Practical reliability · Your team, in control
Too Much Reactive Maintenance
When urgent work consumes the schedule, start by making the recurring burden visible. One bounded problem is easier to act on than a plant-wide wish list.
Make the Next Decision Concrete.
- Agree what counts as a breakdown, planned work and repeat work before comparing records.
- Rank equipment by recorded downtime or cost, then check missing records, duplicates and operating exposure.
- Choose one recurring failure mode. Record its consequence, existing controls and evidence gaps.
- Assign an owner and a review date. Check whether the action changed the failure mechanism or only restored operation.
Use available records and qualified site personnel. This is general guidance, not a diagnosis, safety assessment or authorization to operate.