PMs Keep Getting Skipped for Production
Repeated PM deferrals need a review of purpose, planning and consequences. Completion percentage alone cannot establish whether deferring a task is acceptable.
Make the Next Decision Concrete.
- Connect the task to a specific failure mode and consequence.
- Check the evidence behind its interval, access needs and available warning time.
- Make the required production window, resources and decision owner explicit.
- Use the site's approved deferral and risk-review process; this guide does not authorize continued operation.
Use available records and qualified site personnel. This is general guidance, not a diagnosis, safety assessment or authorization to operate.