Can't Get Reliability Work Funded

A funding request needs a decision, a bounded scope and assumptions that finance can examine. Separate observed costs from proposed reductions.

Make the Next Decision Concrete.

  1. Define the asset or production-line boundary and the period represented by the records.
  2. Avoid double counting lost margin, recovery work, scrap and repair costs.
  3. Compare upfront and recurring costs with low, base and high benefit assumptions.
  4. Record what would change the decision, how uncertainty will be reduced and who will review the result.

Use available records and qualified site personnel. This is general guidance, not a diagnosis, safety assessment or authorization to operate.