Practical reliability · Your team, in control
Can't Get Reliability Work Funded
A funding request needs a decision, a bounded scope and assumptions that finance can examine. Separate observed costs from proposed reductions.
Make the Next Decision Concrete.
- Define the asset or production-line boundary and the period represented by the records.
- Avoid double counting lost margin, recovery work, scrap and repair costs.
- Compare upfront and recurring costs with low, base and high benefit assumptions.
- Record what would change the decision, how uncertainty will be reduced and who will review the result.
Use available records and qualified site personnel. This is general guidance, not a diagnosis, safety assessment or authorization to operate.